Upstairs Bathroom Renovation (Part 15)

Well things are moving along right on schedule, or even a bit ahead of schedule! The plumbers were in today to hook everything back up including the faucets, toilet, and the crazy shower.

It really is coming together. All that is left is a bit of finishing on the tiles, the outstanding timer for the fan, and the accessories (towel bars and toilet paper holder) – for the trades that is. I still have a significant amount of work to get the window wrangled into shape, trim painted, and the final touch-ups completed on the wall paint that is already in place. But that is for later. Right now I want to focus on the plumbing.

First, is the toilet – not much to say here as we are reusing the Toto that we had in place before.

It was in the house when we bought it so I can’t tell you what model it is. May be buried in some of the paperwork that was left behind but I’m not inclined to go looking. Suffice to say that we’ve been very happy with it so no need to fix what ain’t broken. Beside, with the style of tank cover and the porcelain flush lever, it just looks like it belongs.

I know that I put a post up of the faucets before they were installed but here is how they look in place – exactly what we were looking for.

They are from the Grohe Seabury line in StarLight Chrome (very poetic). I think they definitely capture the Victorian sensibility of the room.  But, as much as much as I like the faucets, it is the Sign of the Crab shower fixture that is my favorite part.

It is as much a piece of sculpture as it is a functional shower unit (complete with thermostatic temperature control). No need to compromise form for function here as was the case with the counter top – this is ticks of all the boxes. Also very much in keeping with the Victorian ethos of making even the ordinary look extraordinary as I’ve written about before. I really want to give it a try though that will have to wait until the silicon goes in for the corners of the tile and we get a shower rod and curtain.

Speaking of the shower curtain rod, we’ve been putting off its purchase because it is another place where we are struggling with form and function. On one hand, a curved shower rod provides a feeling of space in the shower that may otherwise feel a touch cramped. On the other hand, the curved rod definitely has a modern feel to it and will go against the traditional approach we took to the room. That said, we’re at the breaking point and will need to make a decision on that tonight so stay tuned.

Now to just get the window completed…

People interested in seeing the full renovation process as tracked in this blog should start here.

The next entry for the renovation can be found here.

Window trim or “Be careful what you start…”

OK, as I mentioned in an earlier blog post, the wonderful new lighting in the bathroom has highlighted just what a state the paint on the original window is in. There are a litany of challenges, both simple and complex, to address including:

  • The many, many layers of paint that have been deposited, chipped, and redeposited over the years.
  • The need to integrate the strip of new pine that was inserted between the casing and the trim to adjust for the new depth of the wall.
  • The need to address the flat, unadorned trim itself – it’s not that it needs to be fancy but should at least mirror the trim that is around the door.
  • Repair the multitude of dings, gouges, and chipped edges of the window stool (the flat portion of the frame at the bottom inside of the window).
  • Free up the painted on stop on the left hand side so that I can eventually take the window apart and restore it from its current painted over single hung action to the double hung function it originally had.
  • Other things that I’m sure I’m forgetting.

Unfortunately, I thought of almost none of these ahead of time.

As the trim had come off during the demo, I at least had the foresight to strip them of their paint and re-prime them before installation. This included an epoxy repair to correct some damage to the top right corner from the removal itself. The result is what you see in the picture above – the dark patches are the filler that the contractor used when re-installing the trim. I figured an easy upgrade was to add on some L-trim on the two exposed edges so that the window would match the door.

All good here though I had to cope the shape of the chair rail into the left hand molding since, as I mentioned, I didn’t plan ahead to have this done before the tiling happened. Still the results look good – just need to fill the nail holes and all done, right? Not so fast…

It is at this point that I should warn you to be careful what you start. As I was getting ready to paint the trim, I realized that the casing where the new pine strip was inserted would not look particularly nice if I just tried to slather yet another coat of paint over it and re-install the blinds.

Alright then – guess I’m stripping the side casing so I can clean up the transition between the old and the new and end up with a lovely smooth single casing.

Hmmm, guess that top casing will need to be done too. Oh, and the stool at the bottom, that has clearly taken a beating over the years and needs a bit of love before getting a new coat of paint. And the sash stops, can’t leave them out of the party…

Cut to 11:45 PM and me still trying to finish that “little bit of stripping” that I started. Finally had to call it a night. This is how it sits at the moment (if you’re wondering why it is so light out at just before midnight, the pictures are from the morning after – was too tired to even get my camera last night).

I’m certain this will look amazing when it’s done but right now, all I can see is another 5 hours of heating, scraping, sanding, and all the other aspects of a dirty job like restoring old windows. And that is just to get the paint off! Still need to patch and fill the wood and get everything sanded down. More to come, stay tuned…

People interested in seeing the full renovation process as tracked in this blog should start here.

Window trim or “Be careful what you start…” (Part 2)

Window trim or “Be careful what you start…” (Part 3)

Upstairs Bathroom Renovation (Part 14)

We now have light! Actually, we have, in a more general sense, electricity. There was apparently a hole in their schedule so the electrician showed up a day early to put in the lights and wire up the switches, outlets, and timer.

Heidi and I both really like the look of the schoolhouse style glass globes so even though they were originally used in kitchens, libraries, and, I assume schoolhouses in the 1920’s we are using them in the bathroom of our 1886 Victorian.

We spent a lot of time looking at different suppliers to try and find a 5 light bar for above the mirror and a matching ceiling fixture but were only able to get a 4 light version. Looking at it now, I’m quite happy with how it turned out. Given the size of the globes, I think that a 5 light version may have been too much.

4 light vanity fixture. The horizontal dark bars in the picture are an artifact of my phone camera being pointed directly at the lights I believe.

For those that are interested, the fixtures are from Sea Gull Lighting‘s Academy line and are remarkably inexpensive compared to other options. We selected the chrome finish as this, along with the details of the metal work, will be mirrored nicely in the faucet and shower hardware once they are in place.

Combined with the white tile and satin white ceiling, they throw a lot of light. Either fixture alone is enough to light the entire room and the two together make it glow!

There was only one small issue that still needed to be dealt with. It seems that the original mechanical fan timer that we had in the room functioned without needing a neutral wire. Unfortunately the electronic replacement that was supposed to replace it does require a neutral – something that wasn’t picked up during the electrical rough-in.

After 10 minutes, or so, of considering where we would need to open a wall to get the appropriate wiring in place (not having a timer is not an option), our electrician suggested that they will try and source a timer that doesn’t need a neutral. Brilliant – not sure why it didn’t even cross my mind to think of that. A quick look on the internet confirms that such a beast exists and is easily available so should have something that doesn’t require so much twisting and noise shortly. In the meantime, the original mechanical timer is back in place.

Finally, just a note on the light switch. Some of you may wonder why we didn’t choose the more modern “Decora” style flat switches. It is really just a preference on our part and Heidi leans strongly to the traditional toggle style. Neither is remotely appropriate for a house of our era.

In our last house, also an 1880’s build, we started to replace some of the light switches with modern push button replicas by Classic Accents. They are CSA approved and UL listed so you get all of the cool period appropriate feel without any safety concerns. They’re great but we just haven’t gotten to doing anything like that here yet. Not sure that it would work for this bathroom anyway as we would have an ultra-modern fan timer next to a push button switch. Could be a bit of discord there.

One unexpected challenge with all this new light is how it highlights clearly the incomplete window trim. But that needs a post of its own.

People interested in seeing the full renovation process as tracked in this blog should start here.

The next entry for the renovation can be found here.

Some side entries on the window can be found here.

Upstairs Bathroom Renovation (Part 13)

The tiles are done! The tiles guys were here today to finish the last of the tiles and do the grouting. Things look great! Not much else to say so here are some pictures of where it stands as of today.

Just the final parts to finish up. Electrical and plumbing then paint clean up and trim!

The next entry for the renovation can be found here.

Tech in the bathroom

Although this blog is associated with the bathroom renovation, it talks about something that I did as a result of convenience rather than anything that was required a for a bathroom.

A side effect of working in the tech sector is that you have a focus on technology in the home that tends to excess. As a result of this, and the fact that poor Wi-Fi coverage is something that drives me nuts, I have an array of Ubiquiti UniFi access points throughout the house. Definitely more commercial than the average home owner needs but, like I said, I’m a techie. Also, in my defense, the double brick construction of our house with 18″ solid wall separating some of the rooms plays havoc with coverage – particular at the extreme ends of our long, skinny layout.

So, as we had the walls open and were pulling wire from the basement for an new electrical circuit anyway, I took the opportunity to bring up an Ethernet cable to the bathroom, a part of the house near the far end of the upstairs. The nice thing about the UniFi AP AC Pro is that it uses standard Power Over Ethernet (POE) so that there is no need to have a separate wall wart plugged in to power it. The result is a nice clean installation with both network connectivity and power provided through the same Ethernet cable. As a side note, these access points do require that you run a separate management server to configure them so are likely not a good option for anyone that doesn’t have a reasonably good grasp of tech (particularly networking).

The end result is an unobtrusive installation on the ceiling that provides excellent Wi-Fi coverage to a part of the house that was under served up to this point.

People interested in seeing the full renovation process as tracked in this blog should start here.

The next entry for the renovation can be found here.

Upstairs Bathroom Renovation (Part 12)

The bathroom is making forward progress again. Today they came and installed the vanity counter top and the under-mount sinks.

They’re pretty efficient – the whole thing was done in well under an hour. Overall the bathroom is coming together quite nicely. I have to admit that it would have been nice to put in a real marble top as you can definitely tell that this is synthetic from the faux grain (closer look below) but this is one of those times that function has to trump form. Real white marble would have had a tough time living with three teenage girls and their assortment of makeup and such (I’m only assuming, that’s not actually an issue yet at all).  I’ve heard a bunch of horror stories about how easily it stains.

For those interested, the sink basins are Kohler Caxtons in white – pretty standard stuff but work really well for what we needed.

The tile should be finishing up either tomorrow or the day after and then plumber and electrician the following couple of days with a target completion of the end of the week.

People interested in seeing the full renovation process as tracked in this blog should start here.

The next entry for the renovation can be found here.

Uptown Waterloo Jazz Festival 2018 – Day 2 (cont.)

Despite a short visit by the rain, the rest of the second day of the Jazz Festival was amazing! We started the evening watching Fern Lindzon, a wonderful vocalist and pianist with her quartet that included the amazing Colleen Allen who plays the most surprising range of wind and woodwind instruments from the piccolo to the tenor sax. I mention her in particular as she also plays with Manteca, the feature band of the evening.

Following Fern was the Ted Warren Commission, a quartet led by percussionist Ted Warren that put on a great show of traditional jazz – he has a great sense of humour as well!

And the finale of the evening, Manteca! who did not disappoint and had the crowd up and dancing while barely into the first song of the set. As mentioned above,  Colleen Allen was there with her amazing array of instruments – great show!

One thing of note is that there was an artist doing a live painting of the band on stage during the performance. You can see her off on the right edge of the stage in the video below. Interesting idea and the finished painting did quite a good job of capturing the energy of the performance.

Unfortunately, as I write this, on Sunday morning, the rain is back in constant downfall which does not bode well for the final day of the festival. Fingers crossed that things clear up later this afternoon.

Uptown Waterloo Jazz Festival 2018 – Day 2

The Festival continues today but, unlike last evening, the weather has been much better. Although there are plenty of clouds in the sky, they are not bringing any rain, yet – they’re actually doing a very good job of keeping the hot sun off us while we watch the performances.

We actually started things off with a trip to the Lancaster Smoke House for some lunch with the folks from East Village Animal Hospital where Heidi is a vet.

I ate so much pulled pork and brisket that I could barely move – and still had enough left over for an entire extra meal! If you are ever in Kitchener-Waterloo, it is definitely worth visiting. In hindsight, we maybe should have hit the Kitchener Rib Fest and Craft Beer Show instead.  For some reason, it is scheduled on the same weekend as the Jazz Festival every year so we’re competing between the two of them. I guess I’ll just have to eat ribs tomorrow.

But back to the festival. All five of us were there today and even brought along Ralphie for part of the show  as it’s a pet friendly venue.

To start things off, it was Jim Gelcer who was great though we only caught the end of their set.

We followed that up with Turboprop who also put on a great show. A lot of horns – very enjoyable.

And finally a 19 piece jazz ensemble, Chelsea McBride’s Socialist Night Club, that was Adelaide’s favorite band of the festival so far.

Ralphie was getting a bit restless so we headed back to the house for supper. Just in time too as the rain has just now decided to make another appearance. Looks like we’ll have to pack the umbrellas for the evening shows. On the other hand, shouldn’t be difficult to get seats I guess.

Uptown Waterloo Jazz Festival 2018 – Day 1

It’s the Uptown Waterloo Jazz Festival this weekend, one of my favorite weekends of the year. The main stage is literally a block from our house and underlines why we love living where we do. As the real estate agents say: the three most important things to look for in a house – Location, Location, Location. Though it doesn’t hurt that the location includes an 1886 build Victorian.

Amelia, Anneliese, and I caught two of the performances today. The first was percussionist Marito Marques and band playing wonderful latin inspired jazz. Lots of people enjoying the music. The sun was out but not too hot – it was a great show.

Just as the set ended, a few drops of rain started to fall so the girls and I headed back to the house for a snack and to pick up umbrellas.

The second show was the headliner for the night – Bassist Mike Downes and friends doing a selection of originals and standards. Again, a spectacular show though somewhat dampened (no pun intended) by the torrential rain that started to come down and continued for most of the set. I took a bit of video to give you a sense of what it was like.

Quite a number of folks headed for the exits but the rest of us popped open the umbrellas and settled in for what turned out to be a wonderful and intimate set given the size of the venue and the conditions.

As I’m listening to rain come down hard and steady outside the window, I have my fingers crossed that tomorrow will be drier. Lots of great jazz still to come!

I’ll leave you with another little sample of Mike Downes to end the night.